Wukong Code v0.0.15 is available now.
It focuses on one promise: a started /loop should reliably reach a clear terminal state.
In that release, preflight checked the objective, model, workspace, active Goal, and project checks before the then-current hosted quota flow. After a restart, an active Loop can be resumed, inspected, or ended as cancelled. Resume always re-reads the workspace and current checks instead of trusting an old Gate result.
Completion retries used a private local outbox, while the then-current Dashboard distinguished active, stale, completed, cancelled, and abandoned runs. Those hosted lifecycle surfaces are not part of the current local BYOK product.